What is Work Method Statement (WMS) | Safe Work Method Statement (SWMS)
What is Work Method Statement (WMS)?
It is the document Submitted by Contractor to Client, covering the general Work procedure of a particular job in a safe manner as per the standards.
Work Method Statement (WMS) is also known as Safe Work Method Statement (SWMS).
What is the use of Work Method Statement (WMS)?
– To Plan and execute the work easily and safely,
– It also helps to know the codes and standards used for each activities.
What are the contents in WMS?
1.0 Scope
2.0 Purpose
3.0 Definitions
4.0 References
5.0 Responsibilities
– Project Manager
– Construction Manager
– HSE Manager
– Safety Officer
– Project Site Engineer
– Site Supervisor/Foreman
– Quality Control Inspector
6.0 Equipment
7.0 Materials
8.0 PPE
9.0 Safety
10.0 Safety Procedure
11.0 Operational Procedure
12.0 Inspection & Testing
13.0 Attachments
– Forms
– Documents
– Records