What is the first step before starting excavation work?

a) Obtain necessary permits  b) Start digging  c) Mark the area with caution tape  Answer: a)

What should you do if you encounter utility lines during excavation?

a) Continue digging carefully  b) Stop work and notify authorities  c) Cover the lines with soil  Answer: b)

What is the minimum slope ratio for trench walls?

a) 1:1 slope ratio b) 2:1 slope ratio c) 3:1 slope ratio Answer: c) 3:1 slope ratio

What equipment should be used to protect workers in trenches deeper than 5 feet?

a) Hard hats  b) Shoring or shielding  c) Safety vests  Answer: b)

What is the maximum allowable depth for a trench without protective systems?

a) 3 feet b) 4 feet  c) 5 feet  Answer: a) 3 feet

What should you do if you notice signs of soil instability in a trench?

a) Ignore it and continue work  b) Fill the trench with soil  c) Evacuate the area and seek professional help  Answer: c)

What should you do if it starts raining during excavation work?

a) Continue working  b) Cover the trench with a tarp  c) Stop work and evaluate soil stability  Answer: c)

What is the purpose of the "Call Before You Dig" hotline?

a) To report emergencies  b) To request utility locates before excavation  c) To order equipment for excavation  Answer: b)